Replacement and new installation buy different work

A new solar proposal should name the inverter and its rating alongside the array. A replacement needs fault diagnosis, safe isolation, removal, matching the existing array, commissioning and any monitoring changes. Roof work and inverter work may have different warranty providers.

Check whether a fault is covered before agreeing to a paid replacement. Ask about labour, transport and diagnostic charges even if the component is under warranty. A nominally free part is not necessarily a free installed repair.

String, hybrid and AC-coupled arrangements

A hybrid inverter can manage compatible solar and battery equipment, subject to its supported combinations. AC-coupled storage may retain a solar inverter. These labels describe an architecture, not a guarantee that a specific battery or array can be connected.

Give the installer model numbers, string information and metering arrangements. Ask whether old monitoring continues to work and whether export controls need reconfiguration. Equipment power and allowed grid export are separate constraints.

Record the complete quote boundary

Ask for inverter model, protections, cable changes, monitoring, commissioning, warranty registration and network paperwork. If replacing an inverter changes a FIT system, clarify the generation meter and payment implications with the relevant parties before work.

No online calculator replaces a competent electrical assessment. Read the installation scope and check the proposal rather than attempting the work yourself.

Battery readiness needs an actual proposal

The phrase battery ready should identify supported battery models, extra hardware, current firmware and cost of the later work. An inexpensive inverter now can still lead to a costly retrofit if the promised compatibility is unspecified. Follow the existing-solar battery journey to collect the right records.

Sources and review dates

Research-based guidance. Source checks do not imply product testing or verification of an individual installer.

  • Energy Saving Trust: Solar panels. Solar suitability, generation, roof and installation considerations; not a local quote dataset. Scope: UK. Checked .
  • Energy Saving Trust: Battery storage. Storage losses, scope of cost estimates and possibility that savings do not justify battery cost. Scope: UK. Checked .
  • Ofgem: FIT generators. Existing FIT arrangements require agreement-specific checks before storage or export changes. Scope: Great Britain. Checked .

Registry sources-2026-11-01. Tariffs have a 30-day internal review interval. Methodology and assumptions.