Compare a battery with your existing solar

The starting values are an illustrative example, not current tariffs, a roof prediction or an installation offer. Replace them with your annual statement and surveyed quote. Generation means annual AC energy available to the home.

Electricity use and solar generation

Direct use is solar consumed as it is generated, before storage. Annual totals cannot establish that demand and sunshine coincide. Do not enter a percentage that already includes battery delivery.

Existing solar costs are sunk

State whether the solar price includes access, inverter, electrical work, commissioning and applicable tax. Annual operating costs start at zero as an exposed scenario assumption; ownership may incur maintenance and replacements.

Additional battery scenario

Usable capacity times assumed equivalent cycles is only a maximum annual delivery bound. It does not show when solar surplus or household demand is available. AC solar diverted becomes household AC delivery after losses; stored energy at the year end equals that at the start.

Power limits and backup scope are not known from these inputs. Check your exact product's charge/discharge kW, reserve, warranty and installation design. Include inverter changes, backup equipment, access and commissioning in the additional cost. The 10-year horizon is an illustration, not a life or warranty claim.

Gather the existing system records

Find the inverter make/model, array size, commissioning date, certification, generation history and electricity statements. Include any generation meter, export limit, monitoring arrangement and FIT or export-payment documents. These let an installer examine the actual system rather than guess from a roof photograph.

Tell the installer your aim: shifting solar to evening use, backup power or another outcome. Backup equipment and power limits need a specific design and may add cost without increasing annual energy savings.

Ask what stays and what changes

An AC-coupled design may retain the solar inverter; another design may replace or reconfigure it. Confirm the exact supported equipment, metering, protection, cable routes, location and commissioning. Do not assume a hybrid label guarantees a later battery is compatible.

Ask who checks network requirements and whether generation-meter wiring or the existing payment agreement is affected. Read the inverter scope guide and obtain professional assessment before electrical changes.

Use the existing system as the baseline

The original solar purchase is sunk for this decision. Compare no new battery with the additional installed battery, including required inverter work, backup equipment and annual costs. Keep direct solar use unchanged. Count only the extra delivered energy after losses and subtract forgone metered exports.

For deemed FIT, absent or unknown export payment, first clarify which arrangement applies. We withhold a battery financial verdict for deemed/unknown cases because a metered SEG formula is not necessarily valid. Physical energy estimates and compatibility questions remain useful.

Request a battery-specific assessment only when available

Battery-only installer matching is not currently verified for this website. You can use the calculation without submitting your details. Check availability and prepare a battery enquiry; an internal request is not installer acceptance.

Before committing to equipment, compare usable capacity, power, backup scope, warranty provider and support. Compare battery cost boundaries and check a retrofit proposal.

Sources and review dates

Research-based guidance. Source checks do not imply product testing or verification of an individual installer.

  • Energy Saving Trust: Battery storage. Storage losses, scope of cost estimates and possibility that savings do not justify battery cost. Scope: UK. Checked .
  • Ofgem: Smart Export Guarantee. Eligibility and supplier-set export terms; export payments are not installation grants. Scope: Great Britain. Checked .
  • Ofgem: FIT generators. Existing FIT arrangements require agreement-specific checks before storage or export changes. Scope: Great Britain. Checked .
  • Ofgem: Co-location storage guidance version 6.2. Existing generation and export metering must be assessed for a storage addition; no blanket FIT preservation verdict. Scope: Great Britain. Checked .

Registry sources-2026-11-01. Tariffs have a 30-day internal review interval. Methodology and assumptions.