Separate module area from buildable layout

Measure the panel dimensions on the exact data sheet, then ask for the proposed arrangement around chimneys, valleys, rooflights and vents. Edge space, fixing details and maintenance access can rule out a layout that fits by area alone. The sizing guide explains the units and panel-count arithmetic.

Roof coverings, battens and structure need assessment by someone competent to specify the mounting. Ask who repairs damaged tiles and how penetrations are weathered. If reroofing is likely soon, price that sequence before fitting equipment above it.

Ask for a generation estimate for each roof face

Orientation, pitch and shading change the energy available. Nearby trees can change over time; chimneys and dormers cast moving shade. Request the survey method and annual AC generation estimate, with its losses. This site does not apply invented orientation or postcode multipliers.

Use that estimate in the payback tool and test a lower generation case manually. Annual kWh still does not demonstrate the overlap with household demand.

Check planning and ownership before paying

Energy Saving Trust notes that domestic solar often falls within permitted development, with exceptions. Confirm the actual property and proposed works with the planning authority, especially listed buildings, conservation constraints or restricted rights. Do not treat a postcode as a permission decision.

For Chelmsford, start with the local roof and sizing guide and the council’s linked planning checker. Obtain any freeholder, lease or shared-roof agreement separately.

Make access and electrical assessment visible

Scaffolding may need a special arrangement over an extension or fragile roof. The electrical survey should address cable routes, protection, inverter location and network requirements. These are professional installation checks, not DIY instructions. Compare the full installation scope before treating a low headline price as complete.

Sources and review dates

Research-based guidance. Source checks do not imply product testing or verification of an individual installer.

Registry sources-2026-11-01. Tariffs have a 30-day internal review interval. Methodology and assumptions.