Check export controls and the final layout
Fourteen example 450 W modules give 6.30 kWp; thirteen give 5.85 kWp. Confirm the chosen count, inverter rating and roof faces. A large nominal array should come with a network and export-control explanation, rather than an assumption that all output can be exported without limits.
Ask who submits the network application or notification, what export limit is assumed and whether changes affect price or generation. Do not infer the connection procedure solely from the array’s rounded DC capacity.
Panel area is only the starting measurement
14 example modules have 6.30 kWp capacity when each is 450 W. The Trinasolar example format is 1,762 by 1,134 mm; other models differ. Module-face area excludes edges, gaps, access and obstructions. Check physical panel sizes and rounding.
Ask for the exact data sheet and layout before accepting a quote. Roof condition and fixing details are professional survey questions. Do not use this panel count as an installation plan.
Compare a complete cash scope
Price panels, inverter, mounting, scaffolding, electrical work, commissioning and paperwork. State whether storage, backup, roof repairs and tax are included. A finance payment is not a comparable cash installation total. The cost guide explains the budget boundary.
If quotes differ, ask which difference is design and which is scope. We do not invent an equipment allocation from a bundled total or describe one proposal as market value on the basis of its rounded size.
Test the quoted generation
For arithmetic only, 5,400 kWh generation with 6,000 kWh demand and 40% direct use gives 2,160 kWh used directly and 3,240 kWh exports. At 30p/15p the benefit is GBP 1,134 before costs. Inverter clipping and export limitations need a surveyed estimate, not this synthetic example.
Run the shared payback calculator with your own generation and cost, direct-use assumption and tariffs. A household statement measures annual demand; direct use is an estimate of the overlap with generation. Keep standing charges outside the saving calculation.
A battery is a separate decision
Request the same array without storage and itemise the additional battery work. Capacity alone does not predict annual savings. Check usable capacity, losses and forgone exports, especially if you already receive FIT payments. Check the proposal before comparing payback claims.
Sources and review dates
Research-based guidance. Source checks do not imply product testing or verification of an individual installer.
- Energy Saving Trust: Solar panels. Solar suitability, generation, roof and installation considerations; not a local quote dataset. Scope: UK. Checked .
- Ofgem: Smart Export Guarantee. Eligibility and supplier-set export terms; export payments are not installation grants. Scope: Great Britain. Checked .
- Trinasolar: Vertex S+ NEG9RC.27. Example 450 W module format 1762 x 1134 x 30 mm; identify exact module revision on a quote. Scope: Product specification. Checked .
Registry sources-2026-11-01. Tariffs have a 30-day internal review interval. Methodology and assumptions.